The job of this console
Pick a report, set filters, read, export. If a number is wrong, fix the project, task, or timesheet, then rerun.
Run permission-scoped reports with date/team filters and export result tables.
Tabular reporting workspace for utilization, delivery, and operational exports.
Operational reports
Reports run permission-scoped operational reports with date/team filters and exportable tables. They read delivery and people sources; they are not a warehouse you type into.
/project/reports
Project Manager · Finance Manager · Executive · Admin
Pick a report, set filters, read, export. If a number is wrong, fix the project, task, or timesheet, then rerun.
Managers and above as persona allows. Contributors use list and timesheet instead.
Choose report, filter, run, export if needed. Do not screenshot a stale export as the live number.
Weekly ops. A customer status pack. After timesheet lock. When analytics hub is too broad and you need this operational grain.
Reports complements dashboard visuals by returning row-level data for audit, export, and analysis workflows.
Header: REPORT selector, date range, team scope, text filter, run/export actions.
Body: Result table with pagination where applicable.
Filters: Report type · Date range · Team selection · Filter list text
The Lux summary strip at the top of this screen is collapsible. Expand it to reveal KPI tiles and chart panels; collapse it for a wider register. All charts respect your active filters (SHOW preset, team scope, date range, text search).
Reports use date/team scope — not Apex charts but operational outputs.
Use the Create Report Config panel to save frequently used combinations for weekly or monthly routines.
Every control, panel, and workflow on this screen.
Analysts, PMs, and finance exporting operational data — twelve report types including utilization, est vs actual, and resource allocation.
Twelve cards: Data Dump, Utilization variants, Est vs Actual, PO estimation, etc.
Scopes all report outputs to period.
Limit to org units for manager views.
CSV/Excel per report — large extracts async on some deployments.
Deliverable-level and activity-level variance reports.
| Role | Access on this screen |
|---|---|
| Resource manager | Utilization and allocation reports. |
| Project manager | Est vs Actual, Project Completion. |
| Individual contributor | My Utilization, My Timesheet Data only. |
| Finance / compliance | 15% Report, Data Dump, Weekly PO Estimation. |
| Control | Description | Notes |
|---|---|---|
| Report catalog grid | Select report type. | See embedded catalog table in guide. |
| Date range | Start/end for extract. | Required before run. |
| Team filter | Org scope. | Optional for personal reports. |
| Run / Generate | Execute report. | May take seconds on large data. |
| Download CSV/Excel | Save output. | Filename includes date stamp. |
| Report description | Purpose and audience per card. | Hover or expand. |
| Schedule (if enabled) | Recurring email. | Admin configured. |